Standards Australia opens draft gas installation standard for public comment
Standards Australia has opened a redlined draft of DR AS/NZS 5601.1:2026, Gas installations, Part 1: General installations, for public comment. The draft is currently being reviewed by committee.
What changes are proposed in the draft AS/NZS 5601.1:2026 gas installation standard?
Gas fitters and plumbers working on gas installations may see changes to the standard they work to. Public comment lets them raise practical concerns before the revised rules are finalised.
Key takeaways
- Standards Australia has opened draft DR AS/NZS 5601.1:2026 for public comment.
- The draft covers Gas installations, Part 1: General installations.
- The public can view a redlined version of the draft.
- A committee is currently reviewing the draft.
Related
Queensland changes plumbing licensing requirements for apprentices
Eligible plumbing apprenticeship graduates in Queensland can now apply directly for a full occupational plumber licence. The change was introduced by the Queensland Building and Construction Commission.
Why it matters: Newly qualified plumbers in Queensland and the businesses that employ them may be able to get licensed more directly after finishing their apprenticeship, which could affect hiring and staffing.
Industry invited to contribute to review of WELS scheme
The Australian Government has opened consultation for the fourth independent review of the Water Efficiency Labelling and Standards (WELS) scheme. Businesses, industry representatives and others are invited to give feedback.
Why it matters: Plumbers who install and specify taps, toilets, showers and appliances could see changes to WELS labelling and product standards. Feedback now could shape compliance rules and product choices.
Building sector calls for urgent national action ahead of CSIRO lab closure
Senior figures from construction, manufacturing and research are calling for a coordinated national framework to protect building research, testing and certification. The push follows the planned June 2027 closure of CSIRO's North Ryde fire testing laboratory.
Why it matters: Builders and fire protection trades rely on tested, certified products. Losing the lab could slow product approvals and certification, which may delay projects and raise compliance costs.